From initial enquiry to finished product in seven steps

A transparent process we follow for every project. Our aim is to ensure you know exactly what will happen, when and who is responsible for each stage.

No unnecessary surprises.

Contract electronics manufacturing is not an off-the-shelf purchase. Every project starts with a conversation and ends with a working product that has passed hundreds of checks. The following seven steps explain exactly how we work.

Quotation
2 to 5days
Languages
CZ · DE · EN
Inspection
100 %

Seven steps to delivery

  1. 01 Day 0

    Enquiry

    Tell us what you need manufactured or assembled. A basic description and scope are enough; we will work out the details together.

  2. 02 24 to 48 h

    Capacity and feasibility check

    We promptly confirm whether we can meet your technical requirements and deadlines. If you are unsure whether your board is suitable for our equipment, ask us before sending the full documentation.

  3. 03 Optional

    NDA

    If required, we sign a non-disclosure agreement before discussing project details.

  4. 04 2 to 5 days

    Documentation and quotation

    Send us your documentation: Gerber files, BOM (bill of materials) and assembly drawing. We will prepare a no-obligation quotation.

  5. 05 Preparation

    Pre-production planning

    We carry out a design for manufacturability (DFM) review, arrange PCB manufacturing and procure components according to the BOM.

  6. 06 Manufacturing

    Manufacturing, inspection and testing

    We assemble, solder, inspect and, where required, programme the boards. Every unit undergoes AOI and 100% final inspection.

  7. 07 Delivery

    Final assembly, packaging and delivery

    We complete the wiring and final assembly, pack the product and hand it over to the carrier, or deliver it to you as agreed.

Frequently asked questions

Here are answers to the questions we hear most often. If you cannot find yours, get in touch.

01 Do you also produce small batches and single units? +

Yes. We produce everything from individual prototypes for developers to medium-sized batches. Our focus is not on mass production; our strength is flexibility.

02 Can you also supply bare PCBs, or do you only work with customer-supplied boards? +

Both. We can work with your materials and bare PCBs, or arrange PCB manufacturing to your specifications.

03 How do you handle NDAs and protect know-how? +

We sign a standard NDA (non-disclosure agreement) with you before you share any technical documentation. Your documentation and project outputs are always protected.

04 Which languages can we communicate in? +

Czech, German and English as standard. We have long-standing relationships with German partners.

05 How long does it take to prepare a quotation? +

We typically prepare a no-obligation quotation within 2 to 5 working days of receiving complete documentation (Gerber files, BOM and assembly drawing).

06 Do you provide inspection reports and records? +

Yes. Depending on the project, we can provide AOI, functional testing and final inspection records.

Have a project ready for production?

Send us your documentation or simply describe what you need. Within a few days, you will know whether we can deliver and at what cost.